January 2016

The Explorer 16/18 has recently inspected a long, difficult pipeline under a roadway for a pipeline operator. The Explorer 16/18 was chosen for this project due to its versatility making it the ideal inline inspection tool for natural gas pipelines with: limited or no flow, short radius or mitered bends, valves, back-to-back bends, and pipelines that cannot be inspected by conventional inline inspection tools or other assessment methods.
Continue reading “January 2016”